Turbine Performance Summary
Capacity factor is the ratio of the actual output of a wind turbine over a period of time and its output if it had operated at rated capacity over the same time span (usually 1-year).
Specifications
School: Dakota Valley High School
Address: 1150 North Shore Dr. North Sioux City, SD 57049
GPS Coordinates: 42°33'01.69" N 96°31'18.58" W
Elevation: 1107 ft
Activation Date: September 2009
Estimated Average Wind Speed: 12 mph @ 45' hub height
Utility Provider: East River Electric, MidAmerican Energy, and Union County Electric
Tower Height and Style: 45' Monopole
Sponsors
- SD WAC
- SWWP Installer
- Utility
- East River Electric
- MidAmerican Energy
- Union County Electric